Carbon Markets & CORSIA

CORSIA Phases and Timeline: Baseline, Pilot, First and Second Phase

CORSIA Phases and Timeline: Baseline, Pilot, First and Second Phase

CORSIA phases in over more than a decade, and the differences between phases are structural rather than cosmetic. They determine who has an obligation, how it is calculated, and how large it is.

CORSIA phases and what each one requires
CORSIA phases and what each one requires

The Periods at a Glance

PeriodYearsParticipationGrowth factorWhat it means
Baseline2019——Reference emissions level
MRV begins2019 onwardAll in-scope operators—Monitor, report, verify
Pilot phase2021-2023Voluntary StatesSectoral onlySmall obligations in practice
First phase2024-2026Voluntary StatesSectoral onlyObligations become material
Second phase2027-2035Mandatory for most StatesSectoral, then blendedCoverage and cost step up

The Baseline: 2019

The baseline is the reference against which growth is measured. It was originally defined as the average of 2019 and 2020 emissions.

The 2020 traffic collapse made that average unusable — it would have set the reference far below any plausible activity level and inflated every future obligation. In 2020 the ICAO Council reset the baseline to 2019 emissions alone.

Monitoring, reporting and verification obligations began in 2019, independent of any offsetting requirement.

Pilot Phase: 2021 to 2023

Applied to operators from States that volunteered. Around eighty States participated at various points.

Two design features defined it:

  • Sectoral growth factor only. Obligations were calculated from sector-wide growth applied to each operator's own emissions, not from individual growth.
  • Route-pair coverage. Offsetting arose only where both origin and destination States participated.

In practice the obligations were very small. The 2021 sectoral growth factor was zero, because sector emissions that year remained below the 2019 baseline. Meaningful obligations only emerged as traffic recovered through 2022 and 2023.

The pilot phase tested the machinery — plans, reporting, verification, registry mechanics — under conditions far gentler than those now applying. Operators who treated it as a genuine dry run are in good shape. Those who treated it as paperwork face a steeper curve exactly as the numbers get large.

First Phase: 2024 to 2026

Same voluntary participation, same route-pair logic, same sectoral basis. What changed is scale.

With traffic above 2019 levels across much of the network, the sectoral growth factor is now materially positive and offsetting requirements are real numbers.

Three things matter operationally:

Compliance periods are three years, and that invites deferral

The 2024-2026 period is a single block. Operators must cancel sufficient units and report by the deadline following the period's end.

The flexibility is genuine. The temptation is to defer purchasing to the end, which is a bet that eligible supply will be available and affordably priced when the entire sector is buying simultaneously. Given the corresponding adjustment bottleneck constraining supply, it is a bet with poor odds.

Eligible supply is the binding constraint, not price alone

Analyses have consistently projected that the volume of units carrying host-State corresponding adjustments will lag demand. Availability, not merely cost, is a live risk — and contracts should say what happens if supply cannot be sourced.

See supply and demand outlook.

Participation can shift under you

States have joined, and at least one has withdrawn. An operator's route coverage can change between planning and paying, without its own network changing at all.

Second Phase: 2027 to 2035

This is the structural change.

From 2027, participation becomes mandatory for States meeting defined aviation activity thresholds — broadly, States with a significant share of international aviation activity measured in revenue tonne kilometres.

Exemptions remain for:

  • Least developed countries
  • Small island developing States
  • Landlocked developing countries
  • States with very small international aviation activity

unless those States choose to volunteer.

Route-pair coverage expands substantially. Routes generating no obligation during the first phase, because one end was non-participating, begin to count.

The Individual Growth Factor Enters

Under ICAO Assembly Resolution A41-22, the calculation is fully sectoral through 2032 and shifts some weight to individual growth from 2033:

Sectoral and individual growth factors
Sectoral and individual growth factors
PeriodSectoral weightIndividual weight
2021-2032100%0%
2033-203585%15%

A carrier expanding faster than the sector progressively carries more of its own burden. The intent is to remove the free ride a purely sectoral approach gives to fast growers.

For operators with aggressive fleet and network plans — and that includes much of the Indian market — this connects growth decisions directly to a future CORSIA cost. That connection belongs in the fleet planning model, not in a surprise later.

Dates That Actually Bind

Phase boundaries are the headline. These are the dates operators actually work to:

Recurring deadlineWhat is due
Before the first reporting yearEmissions Monitoring Plan submitted and approved
Annually, following the reporting yearVerified Annual Emissions Report to the State
After ICAO publishes growth factorsOffsetting requirement becomes a firm figure
Following the close of each three-year periodUnits cancelled and Cancellation Report filed

Exact submission dates are set in national implementing law and vary by State. Check your authority's calendar rather than assuming a common date.

Planning Backwards From 2027

For operators

Model your second-phase obligation against your actual network, not a generic uplift. The change is entirely network-specific — a carrier flying predominantly to already-participating States sees little difference; one with heavy traffic to currently non-participating States can see the obligation multiply.

Have these in place before 2027: a monitoring plan producing reliable data without heroic manual effort, registry accounts opened and tested, a documented view on forward versus spot purchasing, and a model of route coverage under mandatory participation.

For project developers

Second-phase demand arrives on a known date, which makes it the clearest planning signal in this market.

Work backwards: a new project typically needs eighteen months to three years from concept to first issuance, and host-State authorisation is the least predictable element in that span. Developers targeting the demand ramp need to be resolving authorisation now, not when demand becomes visible — by then, supply that was ready will already be contracted.

See the seller pathway.

The Periodic Review

CORSIA includes a review mechanism. The ICAO Assembly periodically reviews implementation and can adjust the scheme's parameters.

Reviews have already produced the baseline change. Further adjustment to growth factor weighting, vintage windows and phase design is possible.

This is not a reason to discount the obligation. It is a reason to build flexibility into the plan — avoid over-committing to a single vintage, avoid assuming a fixed price path, and revisit the model when Council decisions land.

Where to Go Next

Current participation lists are published by ICAO and change — check rather than relying on a saved copy.

DSTechnoverse models second-phase exposure against actual route networks. Talk to our carbon markets team or apply as a CORSIA buyer or seller.

Further Reading

Frequently Asked Questions

What are the phases of CORSIA? A pilot phase from 2021 to 2023, a first phase from 2024 to 2026 (both voluntary for States), and a second phase from 2027 to 2035, mandatory for most States above the activity thresholds.

When does CORSIA become mandatory? From 1 January 2027, at the start of the second phase, for States above defined aviation activity thresholds; least developed countries, small island developing States and landlocked developing countries are exempt unless they volunteer.

What is the CORSIA baseline? 2019 emissions for the pilot phase, and 85% of 2019 emissions from 2024 onwards. Offsetting covers sector emissions above the baseline.

How do sectoral and individual weights change over time? Under ICAO Resolution A41-22, requirements are fully sectoral (100% sectoral, 0% individual) from 2021 to 2032; an individual component of 15% applies for 2033 to 2035, so faster-growing airlines pay more from then.

When must first-phase credits be cancelled? Operators must cancel eligible emissions units covering their first-phase (2024 to 2026) offsetting requirements by 31 January 2028.

Sources and Further Reading

Official and primary sources for the standards, rules and data discussed on this page.