{"slug":"corsia-carbon-credit-price-guide","title":"CORSIA Carbon Credit Prices: What Drives Them and When to Buy","excerpt":"What drives the CORSIA carbon credit price: why first-phase units cost more than pilot-phase and voluntary credits, the Letter of Authorization and corresponding adjustment premium, a worked budget example with illustrative prices, and when to buy.","date":"2026-08-20","author":"DSTechnoverse","image":"/blog-images/corsia/hero-corsia-market.svg","category":"CORSIA & Carbon Markets","tags":["CORSIA carbon credit price","carbon credit cost","CORSIA budget","carbon price forecast","CORSIA eligible unit price","aviation carbon cost","carbon market pricing"],"content":"> **Quick answer:** There is no single CORSIA carbon credit price. What an aircraft operator pays for a CORSIA Eligible Emissions Unit depends above all on which compliance phase the unit is eligible for, whether the host country has issued a Letter of Authorization and committed to a corresponding adjustment, and how much authorised supply exists when you buy. First-phase units (for 2024-2026 obligations) trade well above pilot-phase units and most voluntary credits because authorised supply is scarce and demand rises on a known schedule. Budget from those drivers using price scenarios, and buy progressively rather than all at the end of the compliance period.\n\nFinance teams want a CORSIA number for the budget; procurement teams want to know whether a quote is fair and whether to buy now or wait. Both start from the same point: CORSIA units do not trade on a single public exchange with a reference price, and a figure quoted without its phase, vintage, programme, project type, volume and authorisation status tells you very little.\n\nThat does not make the price unknowable. It makes it explainable. This guide sets out what drives CORSIA credit prices, why first-phase units cost so much more than pilot-phase units, where the Letter of Authorization and corresponding adjustment premium comes from, why supply is constrained, how to build an offsetting budget using clearly illustrative numbers, and how timing affects what you end up paying.\n\n![The CORSIA market](/blog-images/corsia/hero-corsia-market.svg)\n\n> For a short explainer of the price drivers, see [CORSIA credit pricing](/knowledge-base/corsia-credit-pricing/). For generic voluntary market prices, see [carbon credit prices explained](/blog/carbon-credit-prices-explained/). This guide is about the CORSIA-specific price, the budget and the buying decision.\n\n## Why There Is No Single CORSIA Carbon Credit Price\n\nCORSIA, the Carbon Offsetting and Reduction Scheme for International Aviation, requires aircraft operators to offset the growth in international aviation emissions above a baseline. From 2024 that baseline is 85% of 2019 emissions. Operators meet their obligations by cancelling CORSIA Eligible Emissions Units, which are carbon credits from crediting programmes the ICAO Council has approved on the recommendation of its Technical Advisory Body (TAB), and which meet the vintage and other conditions set for the relevant compliance period.\n\nSo a CORSIA unit is not a separate commodity. It is an ordinary carbon credit, issued by a programme such as Verra, Gold Standard, ART or another approved programme, that happens to satisfy a set of eligibility conditions. The same project can issue credits that qualify and credits that do not. That is the root of price fragmentation.\n\nSeveral things split the market into distinct products, each with its own price:\n\n| Dimension | Why it splits the price |\n|---|---|\n| Compliance phase | Pilot-phase and first-phase units satisfy different obligations and have different eligibility rules |\n| Authorisation status | First-phase units need a host-country Letter of Authorization and corresponding adjustment |\n| Programme and approval scope | Approval can be limited by date, unit type or methodology |\n| Vintage | Eligibility windows differ by phase, and older vintages fall out |\n| Project type | Removals, methane avoidance, cookstoves and renewables are priced differently |\n| Volume and delivery | Large, immediately deliverable blocks command different terms from small or forward volumes |\n| Contract form | Spot, forward and offtake contracts allocate risk differently and price it |\n\nTwo quotes can both say \"CORSIA eligible\" and be for different products, so there is no single CORSIA eligible emissions unit price to look up. Before comparing numbers, establish which product each one describes. Our [CORSIA eligible emissions units explained](/knowledge-base/corsia-eligible-emissions-units/) guide covers the eligibility conditions in detail, and the knowledge base page on [CORSIA vintages and eligibility windows](/knowledge-base/corsia-vintages-and-eligibility-windows/) sets out which vintages fit which phase.\n\n## Pilot Phase vs First Phase Unit Prices\n\nCORSIA runs in phases. The pilot phase covered 2021 to 2023. The first phase covers 2024 to 2026. The second phase runs from 2027 to 2035, when participation becomes mandatory for most States, subject to exemptions. Participation in the pilot and first phases is voluntary for States, but operators on routes between participating States carry obligations.\n\nEach phase has its own list of eligible units, and that is the main reason first phase vs pilot phase unit prices differ so sharply.\n\n| Feature | Pilot phase (2021-2023) | First phase (2024-2026) |\n|---|---|---|\n| Obligation size | Small, because traffic was below the baseline for much of the period | Larger, as traffic recovered and the baseline tightened to 85% of 2019 |\n| Letter of Authorization | Not required | Required from the host country |\n| Corresponding adjustment | Not required | Required, so the host country does not also count the reduction |\n| Eligible supply | Comparatively plentiful from approved programmes within the vintage window | Narrow: only units that are both programme-eligible and authorised |\n| Relative price level | Market sources reported pilot-phase units trading at modest levels, often not far from comparable voluntary credits | Market sources have reported a substantial premium over pilot-phase and most voluntary credits |\n| Status | Pilot-phase cancellations have been completed | Cancellation for 2024-2026 obligations falls due in early 2028 |\n\nThe difference is not that first-phase units are physically better tonnes. A pilot-phase unit and a first-phase unit can come from the same project. The difference is that the first-phase unit carries a sovereign commitment from the host country, and very few units carry one.\n\n### Why Pilot-Phase Units Do Not Help With First-Phase Obligations\n\nA pilot-phase unit cannot meet a first-phase obligation, and surplus pilot-phase inventory cannot be carried into 2024-2026. So cheap pilot-phase supply puts no ceiling on first-phase prices, and a low quote is often the first sign that units are pilot-phase or not eligible at all.\n\n### What the Second Phase May Change\n\nFrom 2027 more States participate and demand steps up. Second-phase eligibility is set through the same ICAO Council and TAB process, and the market expects authorisation requirements to continue. If they do, demand for authorised units rises on a fixed date while supply depends on governments, which is why buyers expect the premium to persist. See [CORSIA second phase 2027](/blog/corsia-second-phase-readiness-india-2027/) for what operators should prepare now, and the [CORSIA phases and timeline](/knowledge-base/corsia-phases-and-timeline/) page for the full schedule.\n\n## The Letter of Authorization and Corresponding Adjustment Premium\n\nThe largest single driver of the CORSIA carbon credit price in the first phase is authorisation.\n\nUnder Article 6 of the Paris Agreement, emission reductions achieved in a country count towards that country's nationally determined contribution (NDC). If those same reductions are sold to an airline and used for CORSIA, both the country and the airline would be claiming them. To prevent this double claiming, CORSIA first-phase units require:\n\n1. **A Letter of Authorization** from the host country, authorising the units for use towards international mitigation purposes, including CORSIA.\n2. **A corresponding adjustment**, meaning the host country adds the authorised tonnes back to its own emissions accounting, so the reduction counts once, for the airline.\n3. **Programme-level arrangements** to deal with the situation where an authorised unit ends up double claimed, which some programmes address through replacement guarantees or insurance-type mechanisms.\n\n### Why Authorisation Costs Money\n\nA corresponding adjustment is a real concession: every tonne a government authorises for export is a tonne it can no longer count towards its own climate target. Governments respond by charging a share of proceeds or a fee, limiting authorisation to certain sectors, attaching benefit-sharing conditions, authorising slowly while Article 6 frameworks are built, or declining altogether. Each adds cost, delay or uncertainty that the developer passes on to the buyer. The result is a two-tier market in which identical tonnes from the same project trade at different prices depending only on whether they carry an adjustment. The premium is the price of a sovereign commitment plus scarcity, not a quality premium in the physical sense.\n\n### How Authorisation Status Shows Up in a Price\n\nAuthorisation is not binary from a pricing point of view. Units sit on a spectrum, and prices follow it:\n\n| Authorisation state | What the buyer holds | Effect on price |\n|---|---|---|\n| Authorised, adjustment applied or committed, units issued | A deliverable first-phase unit | Highest; full premium |\n| Letter of Authorization issued, units not yet issued | Delivery and issuance risk | Below fully authorised, discounted for delivery risk |\n| Authorisation applied for, not yet granted | Sovereign risk | Material discount, with conditions in the contract |\n| No authorisation pathway | A unit that cannot meet first-phase obligations | Priced as a voluntary or pilot-phase product |\n\nFor how to value and contract for each state, including long-stop dates and replacement obligations, see our guide to [corresponding adjustment risk](/blog/corresponding-adjustments-corsia-explained/). The [corresponding adjustments and Article 6](/knowledge-base/corresponding-adjustments-article-6/) knowledge base page explains the mechanism itself.\n\n### What to Check in the Letter\n\nA premium is only as good as the document behind it. Confirm that the letter names the right activity, covers the vintages and volumes sold, authorises use for CORSIA or international mitigation purposes, and comes from the competent national authority. \"LoA in progress\" is a different product from an issued letter. See [units delivered without an adjustment letter](/blog/corsia-credits-delivered-without-adjustment-letter/) for what to do when this goes wrong.\n\n## Supply Constraints Behind CORSIA Credit Prices\n\nPrice is where supply meets demand. In the first phase, the two sides behave very differently.\n\n### Demand Is Predictable\n\nOperator demand follows a formula. Each operator's offsetting requirement is its covered emissions in a year multiplied by the sector growth factor, which ICAO calculates from total sector emissions against the 85% baseline. From 2033 an individual growth factor element (15% under ICAO Resolution A41-22) is added, which increases obligations for faster-growing operators. Traffic growth and route coverage are reasonably forecastable, and the 2027 step to mandatory participation is fixed. Demand may be uncertain in size but not in direction. For the formula and worked numbers, see [CORSIA offsetting requirements](/blog/corsia-offsetting-requirements-calculation/).\n\n### Supply Is Not\n\nFirst-phase supply needs four things to line up:\n\n1. A project registered under a programme the ICAO Council has approved for the first phase, within the approved scope.\n2. Vintages that fall within the first-phase eligibility window.\n3. A host country with an operational Article 6 framework that issues a Letter of Authorization.\n4. A corresponding adjustment applied, or committed to, in the host country's reporting.\n\nEach step has its own timetable, and the third and fourth depend on governments rather than markets. Early first-phase supply has come from a small number of sources and host countries. Many projects with eligible methodologies and vintages remain unauthorised, so they cannot be used for 2024-2026 obligations however much demand there is.\n\n### Why Supply Does Not Respond Quickly to Price\n\nIn most markets, higher prices draw out more supply. Here the response is slow: national Article 6 processes, legislation and registry infrastructure take months or years, and new projects need eighteen months to three years to first issuance. A price spike is not a signal that supply is about to arrive. The [CORSIA supply and demand outlook](/knowledge-base/corsia-supply-and-demand-outlook/) covers the structural picture; the practical point for pricing is that the risk is skewed towards scarcity rather than surplus.\n\n## Why CORSIA Units Cost More Than Voluntary Credits\n\nBuyers coming from the voluntary market often ask why CORSIA units cost more than voluntary credits from what look like similar projects. The short answer is that a CORSIA first-phase unit is a voluntary-style credit with extra conditions attached, and each condition removes supply or adds cost:\n\n| Condition | Effect |\n|---|---|\n| Programme approved by ICAO Council | Excludes credits from unapproved programmes or outside approval scope |\n| Vintage window | Excludes older vintages that dominate much voluntary inventory |\n| Letter of Authorization | Adds sovereign process, fees and delay |\n| Corresponding adjustment | Adds a real cost to the host country, which is passed on |\n| Double-claiming remedy arrangements | Adds guarantee or insurance cost at programme or project level |\n| Legal obligation behind demand | Buyers cannot walk away, which supports price |\n\nThe last point is easy to miss. A voluntary buyer can delay or switch to a cheaper credit; a covered operator has a legal obligation, so its demand is inelastic. When obligated buyers compete for a narrow pool, prices rise above the voluntary market even for the same project type. For when the premium is worth paying, see [why CORSIA-grade credits command a premium](/blog/why-corsia-grade-credits-premium/), and for a side-by-side comparison of the two markets, see [CORSIA carbon credit vs voluntary carbon credit](/blog/corsia-carbon-credit-vs-voluntary-carbon-credit/).\n\n## Other Drivers Within the Eligible Pool\n\nOnce phase and authorisation are fixed, prices still vary across eligible units.\n\n**Project type.** Removals, especially engineered or long-lived ones, sit at the top of the range because they are expensive to produce. Nature-based projects are affected by permanence and buffer arrangements. Methane avoidance tends to sit in the middle. Cookstove and household energy credits are cheaper to produce but face methodological scrutiny. Renewable energy credits, where still eligible, tend to be lowest because of additionality questions. See [which carbon projects qualify for CORSIA](/blog/carbon-projects-qualify-for-corsia/).\n\n**Programme and methodology.** A programme's approval can have conditions or exclusions. Units under a methodology the TAB has flagged, or from a programme whose approval is under review, carry approval risk and trade at a discount. Our guide on [managing programme approval risk](/blog/icao-approved-corsia-crediting-programmes/) covers this.\n\n**Ratings and co-benefits.** Some buyers pay more for rated units or strong social outcomes, mainly operators with public sustainability commitments.\n\n**Volume and contract form.** Large blocks may attract a lower unit price, though sellers holding scarce deliverable volume may not discount. Small lots cost more per tonne. Forwards are usually cheaper than spot because the buyer absorbs delivery, authorisation and vintage risk.\n\n**Documentation.** Sellers with a complete pack, including the authorisation letter and registry evidence, command better prices because they shorten diligence. See [the CORSIA project documentation pack](/blog/corsia-project-documentation-pack/).\n\n## What a CORSIA Carbon Credit Price Quote Should State\n\nA quote without context cannot be compared. Ask that every quote states the following, and treat missing items as a reason to discount the offer or ask questions.\n\n| Item | Why it matters |\n|---|---|\n| Programme and project ID | Confirms the units exist and which approval applies |\n| Methodology | Checks approval scope and any TAB exclusions |\n| Vintage(s) | Confirms the eligibility window |\n| Phase eligibility | Pilot phase, first phase or both |\n| Authorisation status | Issued letter, pending, or none |\n| Corresponding adjustment status | Applied, committed, or not yet |\n| Volume and delivery date | Spot or forward, and by when |\n| Price basis | Per tonne, currency, and whether fees, taxes and registry costs are included |\n| Remedies | What happens if authorisation or delivery fails |\n| Transfer route | Which registry account and who pays transfer and cancellation fees |\n\nThe [CORSIA credit due diligence checklist](/blog/corsia-credit-due-diligence-checklist/) covers the full review.\n\n## Budgeting Offsetting Costs: A Worked Example\n\nBudgeting offsetting costs means turning a volume forecast and a range of prices into a figure that a board can approve and a procurement team can work to. The example below uses **illustrative numbers only**. The emissions, growth factors and prices are invented for teaching purposes, are not market quotes and should not be used as forecasts.\n\n### Step 1: Forecast the Volume\n\nAn operator estimates its covered international emissions (on routes between participating States) and applies an estimated sector growth factor for each year of the first phase.\n\n| Year | Covered emissions (tCO2, illustrative) | Sector growth factor (illustrative) | Offsetting requirement (tCO2) |\n|---|---|---|---|\n| 2024 | 500,000 | 8% | 40,000 |\n| 2025 | 520,000 | 10% | 52,000 |\n| 2026 | 540,000 | 12% | 64,800 |\n| **Total** | | | **156,800** |\n\nIf the operator claims emissions reductions from CORSIA eligible fuels, the requirement falls. Assume, for illustration, a SAF claim of 1,800 tCO2 across the period, giving a net requirement of 155,000 units. See [SAF or offsets](/blog/corsia-saf-vs-offsets-strategy/) for how that trade-off works.\n\n### Step 2: Build Price Scenarios\n\nRather than one number, the operator uses three illustrative first-phase price points, labelled here as low, central and high. Again, these are **illustrative figures for arithmetic only, not market prices**: low US$15, central US$20, high US$30 per unit.\n\n| Scenario | Illustrative price per unit | Cost for 155,000 units |\n|---|---|---|\n| Low | US$15 | US$2,325,000 |\n| Central | US$20 | US$3,100,000 |\n| High | US$30 | US$4,650,000 |\n\nThe spread between low and high is roughly two to one. That spread is the reason a single-point budget is unsafe. The board should see the range, and the approved budget should state which scenario it funds.\n\n### Step 3: Model the Buying Pattern\n\nNow compare two ways of buying the same 155,000 units, again with illustrative prices.\n\n**Pattern A: wait and buy everything in the final window.** If the whole sector buys at once and prices move to the high scenario, the cost is 155,000 x US$30 = US$4,650,000.\n\n**Pattern B: progressive acquisition.**\n\n| Tranche | Share | Units | Illustrative price | Cost |\n|---|---|---|---|---|\n| Progressive spot buying in years 1-2 | 50% | 77,500 | US$20 | US$1,550,000 |\n| Forward contract, at a discount for risk absorbed | 25% | 38,750 | US$18 | US$697,500 |\n| Final reconciliation | 25% | 38,750 | US$30 | US$1,162,500 |\n| **Total** | 100% | 155,000 | average about US$22 | **US$3,410,000** |\n\nHere progressive buying saves about US$1.24 million against the late-buying worst case and, more importantly, reduces the risk of not finding enough authorised supply. The saving is not guaranteed: if prices fell late, Pattern A would be cheaper. The case for Pattern B is risk reduction, not a price bet.\n\n### Step 4: Add the Other Cost Lines\n\nUnit cost is the largest line, not the only one. Add registry account, transfer and cancellation fees, due diligence per tranche, legal review of forward contracts, and a contingency for growth factor and participation changes. For a full treatment of the budget lines and how to present them, see [budgeting and forecasting CORSIA costs](/blog/corsia-budgeting-and-forecasting-india/) and [managing the cost of CORSIA compliance](/blog/corsia-compliance-cost-management/).\n\n### Step 5: Reforecast and Record\n\nUpdate the volume forecast when ICAO publishes a sector growth factor, when a State joins or leaves, or when your traffic plan changes, and update price scenarios when real quotes arrive. Record the reasoning behind each buying decision so the strategy can be explained to a board or auditor.\n\n## When to Buy CORSIA Units: Timing Strategy\n\nTwo operators with identical obligations and identical quality standards can pay materially different amounts purely because of when they bought. Timing is the lever most within an operator's control and the one least often decided deliberately.\n\n### The Structural Problem With Waiting\n\nObligations settle per three-year compliance period. The temptation is to wait until the figure is confirmed, then buy exactly what is needed.\n\nThe difficulty is that every operator in the scheme reaches that decision in the same window. Emissions are reported and verified on the same calendar, ICAO publishes growth factors at the same time, and the cancellation deadline is common.\n\nSo deferral is not neutral. It means buying when sector-wide demand peaks, in a market where supply depends on government authorisation decisions that do not flex with demand. In an illiquid market, a buyer who waits may find the supply for their period already contracted.\n\n### What Progressive Acquisition Means\n\nBuying across the compliance period rather than at its end. In practice:\n\n1. **Estimate annually.** Model the obligation each year from covered emissions and an estimated growth factor rather than waiting for confirmation.\n2. **Buy a conservative portion early.** Deliberately below your central forecast, so over-cancellation is unlikely. There is no carry-forward of surplus cancellations, so surplus is spent money.\n3. **Reconcile at the end.** Reserve the final window for the balance, not the bulk.\n\nYou commit before the final number is confirmed, in exchange for spreading price exposure. For most operators that is worth it, because the alternative's downside is an unmet legal obligation, not a slightly higher price.\n\n### Forward, Spot, or Both\n\n| | Spot | Forward |\n|---|---|---|\n| What you get | Units that exist now | A contractual claim on future issuance |\n| Price | Market at the time | Typically below spot |\n| Secures | Price only | Existence as well as price |\n| Risk absorbed | Little | Delivery, authorisation, vintage |\n| Suits | Confirmed near-term need | Confident volume forecast, longer horizon |\n\nThe third row matters most here. A forward is usually framed as a price hedge, but in this market its more valuable property is securing that units will be available at all. Its discount is compensation for the risks you absorb, not a bargain, so make sure the contract allocates authorisation and vintage risk explicitly. The [CORSIA offtake agreement terms](/blog/corsia-offtake-agreement-terms/) guide covers the clauses that matter.\n\n### A Workable Default\n\nFor an operator without a strong view, a defensible starting position:\n\n- **40-60% acquired progressively** across the first two years of the compliance period, in tranches, from authorised spot supply.\n- **20-30% contracted forward**, where a project with a credible authorisation position is available and the contract carries a long-stop date.\n- **The balance reserved** for reconciliation in the final window once the obligation is firm.\n\nAdjust the split by how confident you are in the volume forecast. High confidence supports more forward and more early acquisition; genuine uncertainty argues for keeping more back.\n\n### Timing Signals Worth Watching\n\n- **Growth factor publication.** Converts your obligation from a range into a number. Buying before it is buying against an estimate.\n- **Participation list changes.** A State joining moves your covered emissions without any change to your operation, and it moves everyone else's too.\n- **Programme approval decisions.** A lapse or restriction removes supply from the market abruptly.\n- **Host-country authorisation decisions.** A new national framework or a batch of letters can add supply; a pause can remove it.\n- **Vintage window decisions.** A window shifting can strand inventory, including yours.\n- **The 2027 boundary.** Mandatory second-phase participation steps demand up across the whole sector on a known date.\n\nMost are unpredictable in timing but knowable when they happen, so watch them rather than forecast them. The 2027 step is fixed and plannable, which is why it is worth acting on now.\n\n### Timing Around the Administrative Tail\n\nEven a well-timed purchase fails if the mechanics do not complete.\n\n| Step | Allow |\n|---|---|\n| Registry account opening | 4-8 weeks |\n| Due diligence per tranche | 1-3 weeks |\n| Contract negotiation | 2-6 weeks |\n| Payment and transfer | 1-3 weeks |\n| Cancellation | Days, plus processing |\n| Report and acknowledgement | 1-2 weeks |\n\nRoughly three to six months for a first cycle. An operator deciding in month thirty-four of a thirty-six-month period has not left time for the process, regardless of whether supply exists. The [CORSIA registry cancellation runbook](/blog/corsia-registry-cancellation-process/) covers the final steps.\n\n## Common Pricing and Timing Errors\n\n| Error | Consequence |\n|---|---|\n| Budgeting from a voluntary market average | Budget measures a different product and is wrong in an unknown direction |\n| Accepting a low quote without checking phase | Units may be pilot-phase or unauthorised and unusable for 2024-2026 |\n| Paying a first-phase price for \"LoA pending\" units | Buyer carries sovereign risk without a discount |\n| Single-point budget | No room for price or growth factor movement |\n| Waiting for a confirmed obligation | Buying alongside the entire sector |\n| Buying the full requirement early | Over-cancellation; surplus is spent |\n| Treating a forward as a price bet | Missing that it secures availability |\n| No long-stop date on a forward | Sovereign risk with no exit |\n| Ignoring the administrative tail | Supply secured, delivery too late |\n| Concentrating in one vintage or host country | Exposure to a single decision |\n\n## Timing and Pricing for Sellers\n\nThe same dynamics work in reverse for developers. Authorised supply sells into a seller's market, because it is the scarce product; authorisation is the step that creates most of the value, so delaying it delays the price as well as the sale. Unauthorised supply sells at a discount that reflects the sovereign risk the buyer is asked to take. With demand stepping up from 2027 and projects needing eighteen months to three years to first issuance, developers aiming at the second phase need to be moving on authorisation now. Indian developers can find more in [pricing and negotiating CORSIA credits from India](/blog/corsia-credit-price-negotiation-india/).\n\n## How DSTechnoverse Helps\n\nDSTechnoverse supports aircraft operators and project developers with the analysis behind CORSIA purchasing decisions. We estimate offsetting requirements from your emissions data, build budget scenarios using the drivers set out above, and check quotes for phase eligibility, programme approval scope, vintage and authorisation status before you commit. We also support sourcing and due diligence of CORSIA Eligible Emissions Units, registry cancellation steps, and emissions monitoring plan and SAF claim preparation. We are not a verification body and do not verify emissions reports. See our [CORSIA carbon credit services](/services/corsia-carbon-credit-services/) or [contact us](/contact/) to discuss your obligation.\n\n## Frequently Asked Questions\n\n**What is the current CORSIA carbon credit price?** There is no single published price. CORSIA units trade bilaterally and through brokers, and prices depend on phase, authorisation status, project type, vintage and volume. Market sources have reported first-phase units at a substantial premium to pilot-phase and most voluntary credits. Ask for quotes that state every element of the product before comparing them.\n\n**Why is the CORSIA eligible carbon credit price for 2025 higher than for pilot-phase units?** Obligations for 2024-2026 can only be met with first-phase units, which need a host-country Letter of Authorization and a corresponding adjustment. Few units meet those conditions, while operator demand grew as traffic recovered and the baseline tightened to 85% of 2019 emissions. Pilot-phase units cannot be used for first-phase obligations.\n\n**Can I use cheaper pilot-phase units for my first-phase obligation?** No. Each compliance period has its own list of eligible units and its own conditions. Pilot-phase units satisfied 2021-2023 obligations only. For 2024-2026 you need units approved for the first phase, within its vintage window, carrying authorisation and a corresponding adjustment. A low quote is often a sign the units are pilot-phase.\n\n**How much of the price is the corresponding adjustment premium?** It varies by host country, project and contract, and there is no reliable public figure. The premium reflects the host government's cost of forgoing those tonnes against its own climate target, plus the scarcity of authorised supply. Compare quotes for the same project with and without authorisation where you can.\n\n**Why do CORSIA units cost more than voluntary credits from similar projects?** Each CORSIA condition removes supply or adds cost: ICAO programme approval, vintage limits, a Letter of Authorization, a corresponding adjustment and double-claiming remedies. Demand is also driven by a legal obligation, so operators cannot walk away when prices rise, unlike many voluntary buyers.\n\n**How should we budget offsetting costs for the first phase?** Forecast your offsetting requirement from covered emissions and estimated growth factors, apply low, central and high price scenarios, and model the buying pattern. Add registry, due diligence and legal costs, plus a contingency. Present the range to the board and state which scenario the budget funds, then reforecast at each new data point.\n\n**Should we wait for CORSIA credit prices to fall?** Supply depends on government authorisation decisions that cannot be forecast, while demand rises on a known schedule, including the 2027 step. The risk is skewed towards scarcity. Waiting also means buying in the same window as every other operator, so progressive acquisition is usually the safer course.\n\n**Is a forward contract cheaper than buying spot?** Usually, because the buyer takes on delivery, authorisation and vintage risk. The discount is payment for that risk, not a bargain. In a constrained market the main benefit of a forward is securing availability. Make sure the contract has a long-stop date and clear remedies if authorisation or issuance fails.\n\n**Does project type change the CORSIA credit price?** Yes. Within the eligible pool, removals tend to be priced highest, methane avoidance in the middle, and cookstove and renewable energy credits lower. Approval scope, ratings, co-benefits and documentation quality also move the price. Phase and authorisation status remain the larger drivers.","related":[{"slug":"carbon-credit-prices-explained","title":"Carbon Credit Prices Explained: What Drives the Range"},{"slug":"corsia-budgeting-and-forecasting-india","title":"Budgeting and Forecasting CORSIA Costs for an Indian Operator"},{"slug":"carbon-credit-price-what-drives-cost","title":"Carbon Credit Prices in 2026: What Drives the Cost"},{"slug":"carbon-pricing-impact-on-airlines","title":"Carbon Pricing and Airlines: The Real Impact on Costs and Strategy"}]}